Type Of Enclosure
|
Original / Photocopy
|
Attestation Required
|
Documents Recommended
|
Photo ID of the applicant
|
Original
|
Not Required
|
Photo ID of the applicant
|
Completion certificate from a licensed electrical contractor and the work order
|
Original
|
Not Required
|
Completion certificate from a licensed electrical contractor and the work order
|
List of equipments
|
Original
|
Not Required
|
List of equipments
|
Permission letter from DISCOM/Transmission company
|
Original
|
Not Required
|
Permission letter from DISCOM/Transmission company
|
Factory/site test report of Generator
|
Original
|
Not Required
|
Factory/site test report of Generator
|
CT/PT/ meter test report
|
Original
|
Not Required
|
CT/PT/ meter test report
|
Manufacturer’s test report of Major equipments
|
Original
|
Not Required
|
Manufacturer’s test report of Major equipments
|
Site test results of Major equipments
|
Original
|
Not Required
|
Site test results of Major equipments
|
Transformer(Above 200KVA) Oil test report from STL/NABL accrediated laboratory
|
Original
|
Not Required
|
Transformer(Above 200KVA) Oil test report from STL/NABL accrediated laboratory
|
Compliance document of last inspection
|
Original
|
Not Required
|
Compliance document of last inspection
|